Fireplace Alterations & Multi-Fuel Stove
DERBY - 2018
“fantastic job”
Project:
Replace dated gas fireplace with freestanding multi-fuel stove
Products and Materials:
Charnwood C Five 5kW multi fuel stove
Oak beam, black slate hearth, 904 grade multi fuel chimney liner
Budget:
£3,000 (2018)
Scope of Works:
Dismantle & remove existing stone fireplace & gas fire
Cap gas supply pipe beneath floor boards
Open chimney breast to suit freestanding solid fuel stove
Install structural concrete lintel above fireplace opening
Install flue liner and bird guard cowl to chimney pot
Install steel register plate
Clean and re-point original brickwork in opening (found in a reasonable condition)
Hang brackets to install decorative oak beam
Install black slate hearth
Supply and install multi fuel stove with connecting flue pipe
Install CO alarm
Make good plaster around fireplace and chimney breast – leave ready for decoration
Remove all waste
Commission stove and flue liner
Customer handover and demonstration
BACK TO CASE STUDIES